Construction Surveying
BCM230
Theory and application of site layout and surveying operations utilized in the construction process. Techniques include taping, differential leveling, laying off vertical and horizontal angles, open and closed traverse surveys, topographic surveys, and construction control surveys.
3 Credits: 1 Lecture, 6 Lab
Prerequisites:
BCM142